The machine stops on plan, not in the middle of an order.
Every machine has a record, a maintenance plan and a history of interventions. Scheduled stoppages take time in planning, and the parts consumed and hours worked are recorded on the intervention.
What it solves
The machine record, in one place
Documents, authorisations, parameters and history. No more searching through binders when someone comes to inspect.
A preventive maintenance plan
Periodic interventions are scheduled in advance, by running hours or by calendar, and become visible to planning.
The intervention records parts and hours
It is known what was replaced, who worked and how long it took. Maintenance cost is no longer an estimate made at year end.
History shows the machines that need attention
A repeating fault becomes visible. The repair-or-replace decision starts from history, not from impression.
The maintenance plan for the month, with open interventions.
| Machine | Intervention | Scheduled | |
|---|---|---|---|
| U-07 · paint booth | Filter change | 10.09.2026 | Scheduled |
| U-03 · press | 500 h service | 18.09.2026 | Scheduled |
| U-11 · compressor | Reported fault | — | Open |
| U-02 · cutting | 500 h service | 04.09.2026 | Closed |
The U-07 intervention is the same stoppage that appears on Wednesday in planning.
demo dataRelated apps
Want to see the app on your own flow?
We arrange a demo on your company’s actual case. The app above comes preselected in the form.